Tank to Pump

Standpipe / High-Rise

Standpipe planning is pump-discharge math plus a fixed allowance for the building's piping and a floor's worth of elevation per level above the pump. The trap: the outlet limit applies at the fire-floor hose valve, not at your pump.

From the floor outlet to the nozzle.

Blank means street level (floor 1).

Blank uses the training default (25 psi). Some departments carry a higher allowance.

Enter values above to see the result.